This year In Zelenograd it is planned to repair more than 22 km of highways

15.02.2018
This year In Zelenograd it is planned to repair more than 22 km of highways

The program of current repairing highways in Zelenograd in 2018 is formed. It’s planned to put in order 390 thousand square meters or 22.7 km of the roads of the town in total, which is 16.8% of the total volume of road facilities of the city.

Last year the asphalt covering was replaced by an area of ​​336 thousand square meters or 22.2 km of motorways.

In 2018 maintenance is planned to be carried out on Alexandrovka Street, Boldov Creek, roads in the village Rozhki, around the MIET campus, around 11 microdistricts, to the CIE, at Zheleznodorozhny Driveway, Zavodsky lane, Lesnaya Street, Letchitsa Tarasova Street, Malinskaya Street, Medvedkovsky street, Novaya Novokryukovskaya street, Panfilov street, Kryukovskaya viaduct, Ozernaya avenue, Kryukovskaya square (partially), thoroughfares №№4800 and 4806, driving from Malinskaya street to Lesnaya street, Prudnaya street, Radio, Rovnaya, Sadovaya 3rd, Shkolnaya and Yablonevaya alley.